Skip to main content

SVPL

Maharashtra · Residential · Commercial · Industrial Solar
Solar.
Done Right.
225+ plants across Maharashtra. Zero accidents in 8 years. One engineering standard, whether it's your home, your shop, or your factory.

Whoever you are, the decision looks the same: keep paying MSEDCL every month, or build something that pays for itself. We size the system to you, not the other way around.

Zero Accidents Ever150 km/hr Wind Rated25-Year ResponsibilityMS Engg · University of Cincinnati Ohio
SVPL Solar rooftop installation — rows of solar panels under a clear sky with hills in the background
25MWP+
Capacity Installed
Across factories in North & East Maharashtra
ZERO
Accidents. Ever.
Documented safety record on every project
8 Years
In Solvar EPC
Near-free electricity for 19+ more years after
225+
Plants Comissioned
Achieved by large textile mills on HT tariff
The Problem We Solve

Electricity
is the Bill Nobody Questions.

Whether it’s a household bill or a factory’s monthly MSEDCL statement, the pattern is the same: it goes up, nobody pushes back, and it’s treated as fixed. It isn’t.

01

It's Bigger Than You Think

For a business, electricity is often the 2nd or 3rd largest cost. For a home, it’s simply money that could be going somewhere else every single month.

02

Most Installers Vanish After Commissioning

Contractor installs, gets paid, disappears. One fault, one storm and the number you’re calling doesn’t pick up.

03

Cheap Panels Cost More by Year 5

Lower-tier panels degrade faster. What looks like a saving on day one quietly erodes over the life of the system.

Which One Is You?

Swami Vessels Pvt. Ltd. builds for three different customers, and the engineering standard doesn’t change between them; but the numbers, the process, and the paperwork do.

Residential For Your Home.

PM Surya Ghar subsidy up to ₹78,000. EMI-friendly. Sized for your roof, not a factory-scale system. → Explore Residential Solar

Commercial For your business.

 Shops, offices, warehouses. Net metering and tax treatment handled properly, not left to guesswork. → Explore Commercial Solar

Industrial For your factory.

Engineering-led EPC – structural assessment, DPR, 25 – year warranty. Built for facilities that can’t afford a mistake on the roof. → Explore Industrial Solar

Why People Trust Us

Not Adjectives.

Proof.

🔬

Engineering-Led From Day One

Founder Himanshu Ingale holds an MS in Mechanical Engineering with published solar cell research. Panels and structures are specified by calculation, not commission.

📋

Branded, Tier-1 Quality Only - Tata Power Channel Partner

We work exclusively with branded, certified panels, backed by our standing as a Tata Power Channel Partner, one of the most recognized names in Indian solar.

🏗️

150 km/hr Wind-Rated Structures

Every structure engineered for Maharashtra’s monsoon winds, assessed for your specific roof before a single panel goes up.

📡

You Call the Person Who Can Actually Fix It

One client put it plainly: “If I call any employee, my work gets done. But when I call the owner directly, everything gets solved.” That’s how support is structured here. 

🏦

We Show Up After the Sale.

A client of over a decade told us: “After-sales and service – I call him, he says we have a problem, we’ll send the team the next day.”

⚠️

Safety. Always. Non-Negotiable.

Zero accidents across every project. Helmets. Harnesses. Lock-out/tag-out procedures. Every subcontractor trained before first day on site. This is not a slogan. It is our record.

HI

Founder & Chief Engineer

Himanshu Ingale

The Engineer Behind It

Built in a Factory.
Perfected in Ohio.

“I built SVPL Solar because I grew up watching Maharashtra’s factory owners pay extortionate electricity bills while substandard solar installers gave them a worse deal than the grid. That ends here.”

MS Mechanical Engineering, University of Cincinnati, Ohio. Published research on nano-scale surface engineering for solar cell efficiency improvement. Born in Maharashtra. Trained in American engineering rigour. Back to build it right.

MS Mechanical Engg
University of Cincinnati · Ohio
Solar Research Published
MSEDCL Certified EPC
25-Year Commitment

5

MW+ Installed

0

Accidents. Ever.

25

Year Responsibility

150

km/hr Wind Rating
Results That Hold

Real Plants.
Documented Numbers.

1.1MW

Textile · Jalgaon

Spinning Mill — 100 TPD Capacity, Jalgaon District

1.1MW

System Size

₹72L

Annual Saving

4.8yr

Payback

HT consumer on 11 kV supply. Pre-solar effective unit cost: ₹10.40/unit including MD charges and fuel surcharge. Post-solar: ₹2.80/unit blended. 150 km/hr wind-rated ground-mount structure. Zero accidents during 14-week installation.

480kW

Cold Storage · Nashik

Multi-Chamber Cold Storage, Nashik — Agri & Pharma

480kW

System Size

₹28L

Annual Saving

5.2yr

Payback

LT agricultural cold storage. Challenge: compressor start surge and MD peaking. Solution: Solar array timed to offset morning MD demand charge window. MD penalty reduced by 38%. Net metering sanctioned in 10 weeks through Nashik MSEDCL.

620kW

Auto-Ancillary · Aurangabad

Auto-Component Pressing Plant, Aurangabad Industrial Belt

620kW

System Size

₹44L

Annual Saving

5.6yr

Payback

Three-shift production, high night demand. Solar covers 62% of total consumption. Structured on pre-engineered factory sheeting roof, age 14 years — required full structural load audit before design. Audit revealed two purlins requiring reinforcement. Fixed before panel installation. No compromise.

How We Work

Seven Phases.
Zero Surprises.

No two factories are the same. The process that gets you from a phone call to a working plant is. Here’s exactly what happens, in order.

01

Free Consultation

An engineer visits your site. We look at your roof or land, your load pattern, your bill. If solar doesn’t make sense for you yet, we’ll tell you that too.

02

Personalised Proposal

You get a digital model built around your actual numbers: expected generation, year-by-year payback, real rupee savings. If we recommend a smaller system than you asked for, that’s not us underselling.
That’s us guiding you about what you actually need.

03

Post-Order Paperwork:

DISCOM applications, layouts, compliance filings, we own all of it. You don’t chase MSEDCL. You don’t fill forms. We communicate every step so you’re never wondering where things stand.

04

Installation:

ERP-managed, engineer-supervised, zero accidents in 8 years running. Galvalume-coated walkways, safety lines, HILTI waterproofing, surge protection, documented on every install, not just the ones someone happens to photograph. You get daily site updates and photos. 

05

Final Documentation:

You get your 5-year comprehensive Tata Power warranty certificate, full system documentation, and a proper handover.

06

Dedicated Support:

Online generation monitoring, monthly performance reports. If something does go wrong, we’re proactive about it. 

07

Long-Term Partnership:

This is where most vendors disappear, but we don’t. Clients who installed their first plant with us come back for their second, then a third, as their load grows. If you refer us to someone, that gets recognised by name. 25 years is a long time to be someone’s vendor. We’d rather be someone’s partner for that long.

What Factory Owners Say

The Proof Is
In Their Bills.

★★★★★

“Before solar, my bill was ₹2,500–3,000 a month. Now I don’t get a bill at all.”

AS
Anil Shyam Sonone

Retired Bank Employee, Jalgaon (Residential)

★★★★★

“There are many players in the market related to solar. I wanted a genuine person… if you want a low price, you’ll have to compromise on the product.” 

MN
Milind Naik

Raj Industries, Jalgaon (Industrial)

★★★★★

“Himanshu sir’s visits happened at the factory within two months, on his own, to check, if there’s any issue with washing or with a panel, he’d come check it himself.” 

DN
Dinesh Sunil Nandwani

RT Plus Pvt Ltd, Jalgaon (Industrial)

★★★★★

“After we installed solar, we switched from LPG to induction, from petrol two-wheelers to electric, and recently even our car to EV, all because of what solar freed up.” 

S
Dr. Suyash Sanmani

Dentist, Jalgaon (Residential)

Industry Savings Data

What Your Industry
Typically Saves.

Every number below is based on actual MSEDCL tariff slabs, real load profiles from client energy audits, and conservative generation estimates — not marketing projections.

Industry

Monthly Units

Annual Saving

Payback

MSEDCL Tariff

Textile & Spinning Mill

1,00,000 – 2,50,000

₹40 – 80L

4 – 5.5 yr

HT-1 / LT-III

Food Processing Plant

50,000 – 1,20,000

₹20 – 50L

4.5 – 6 yr

LT-III / HT-1

Cold Storage & Ice Plant

40,000 – 90,000

₹15 – 35L

5 – 6.5 yr

LT-III / HT-1

Auto-Ancillary / Pressing

60,000 – 1,50,000

₹25 – 55L

4.5 – 6 yr

HT-1 / LT-III

Cotton Ginning

30,000 – 80,000

₹12 – 28L

5 – 6 yr

LT-III

Engineering Works / CNC

40,000 – 1,00,000

₹18 – 40L

4.5 – 5.5 yr

LT-III / HT-1

Service Regions

Maharashtra.
Every District.

MSEDCL approval timelines, local DISCOM contacts, and ground teams — we know the process in every region we serve. No excuses about bureaucracy. We navigate it for you.

Jalgaon

Home Region
  • Textile & spinning mills
  • Cotton ginning units
  • Food processing
  • Engineering works

MSEDCL Net Metering

8 - 12 weeks

Nashik

Industrial Belt
  • Auto-ancillary cluster
  • Cold storage & agri
  • Wine & food processing
  • Engineering plants

MSEDCL Net Metering

8 - 12 weeks

Aurangabad

Auto-Ancillary Hub
  • Automotive component plants
  • Pharma manufacturing
  • Textile processing
  • Engineering MIDC

MSEDCL Net Metering

10 - 16 weeks

Nagpur

Vidarbha Capital
  • Cotton & agri processing
  • Power-intensive industries
  • MIHAN zone units
  • Engineering sector

MSEDCL Net Metering

10 - 16 weeks

Mumbai

Commercial & Suburban
  • Commercial complexes
  • Industrial Thane/Bhiwandi
  • Cold chains & logistics
  • Manufacturing Navi Mumbai

MSEDCL Net Metering

14 - 20 weeks
Frequently Asked

Questions Factories Ask Before Saying Yes.

We answer the hard questions first. Not after you sign.

A typical SME consuming 50,000 – 1,50,000 units/month can save ₹20 – 80 lakh annually, depending on tariff slab, load profile, and system size. SVPL Solar provides a free energy audit with factory-specific numbers from your actual bills — not generic estimates.
For most industrial consumers payback is 4 – 6 years. HT consumers in Nagpur or Mumbai often see 3.5 – 5 years due to higher tariff slabs. After payback, the plant generates near-free electricity for 18 – 22 more years — a documented 3 – 5x return on investment.
Yes, always. Any EPC that quotes without assessing your roof is cutting corners. We assess every roof — age, material, purlin spacing, load-bearing capacity — before designing a single mounting point. We have declined projects where the roof could not support the load. We will never compromise your building to make a sale.
Jalgaon and Nashik: 8 – 12 weeks. Aurangabad and Nagpur: 10 – 16 weeks. Mumbai suburban: 14 – 20 weeks. We manage the entire process — DPR, application, follow-up, inspection, and meter installation. Your job is to run your factory. Ours is to handle the bureaucracy.
Tier-1 manufacturers only — primarily Waaree, Adani Solar, Vikram Solar. Never selected on commission. We show you the technical data sheet for every panel we propose. You know exactly what you are buying and why we chose it.
Yes. MSME term loans are available from SBI, Bank of Maharashtra, Bank of Baroda, and Jalgaon Janata Sahakari Bank. We provide the project report and feasibility documentation required for loan sanction — formatted to the bank’s requirements, not just our own template.
Yes. Remote monitoring, quarterly physical visits, and formal AMC contracts for all plants. Available for 25 years — not just at commissioning. We track your generation data and will call you if we see output anomalies before you even notice them.
Free Resources

Education First.
Sales Second.

We write what factory owners actually need to know — not what sounds good in a brochure.

Electricity Costs

What Your MSEDCL Bill Actually Costs Per Unit — After All Hidden Charges

Most owners know their monthly total. Few know their real effective rate after fixed charges, MD charges, fuel adjustment, power factor penalty, and taxes. This changes your payback calculation dramatically.

8 min read
EPC Selection Guide

10 Questions to Ask Before Signing a Solar EPC Contract in Maharashtra

The wrong EPC costs you crores over 25 years. These 10 questions — asked before signing — will reveal everything you need to know about whether an EPC can be trusted with your capital expenditure.

7 min read
Technical

Solar Panel Degradation — What It Means for Your 25-Year Return on Investment

Cheap panels degrade at 1.5 – 2%/year vs 0.5% for quality Tier-1 panels. Over 25 years, that gap is enormous — equivalent to losing 6 – 7 years of generation. The numbers are in this article.

9 min read
TAKE THE FIRST STEP

What Would You Do

With

₹50 Lakh

Extra Per Year?

Most factory owners we speak to have never run the real numbers. We run them honestly — with your actual tariff slab, your actual load profile, and a conservative payback projection. No hype. No pressure. No obligation.

Free · No obligation · Response within 24 hours
Jalgaon · Nashik · Aurangabad · Nagpur · Mumbai